1993 - Page 19


Calverton Closed 1993 After 41 Years

- Continued -

Dirt disposal was by TS14 and TS24 scrapers and bulldozer. In 1992 a Dosco 65hp MkIIA was replaced with a Dosco SL120H due to the rock strengths in the cross measures 1in5 drift to the Top Hard seam being in excess of 14,000psi.

Panel Nos: High Main:

  • South West double-unit panel Jan 1952 - 28th Aug 1953 and 4th Oct 1953 (was to the South West of the shafts but working in a North West direction!)
  • 1s double-unit May 1953-18th Jan 1958
  • 2s double-unit Oct 1953-18th June 1955 and 19th Nov 1955
  • 11s Apr 1954 - 17th May 1957
  • 9s Apr/May 1954 - 3rd Oct 1955
  • 7s June 1953 - 12th June 1954 and 8th Jan 1955
  • 10s double-unit Sep 1954 - Nov 1956
  • 20s Oct 1954 - June 1959
  • 3s Apr 1955 - Oct 1958
  • 21s Apr 1956 - 8th Apr 1960
  • 41s Oct 1956 - Mar 1958
  • 30s Nov 1955 -Sep 1956, dropped right hand side, cont'd to Nov 1960, re-head Apr 1961 - Nov 1962
  • 52s Oct 1956-3rd Apr 1957, short run stopped at fault
  • 8s Jan 1957- Oct 1957 short run
  • 42s Jan 1957 - July 1957 short run
  • 44s double-unit Aug / Sep 1957 - Nov 1958
  • 54s Mar 1957- 28th Nov 1957, stopped at fault
  • 46s double-unit Nov 1958 -22nd Oct 1960
  • 58s Oct / Nov 1957- 1959, 58s re-start Nov 1959 - 8th Mar 1961
  • 150s Nov 1962 -16th Oct 1964
  • 41s Oct 1956 -18th Mar 1958
  • 43s Jan 1958 - 25th July 1959
  • 47s Mar 1958 - 13th Feb 1959
  • 152s Nov 1958 - 2nd Jan 1962
  • 57s Apr 1959 - 21st Sep 1961
  • 59s Apr 1959-14th Jan 1960 double-unit
  • 156s double-unit Apr 1960 - 20th July 1962
  • 49s 19th Sep 1959 - 4thJan 1961
  • 45s July 1960 - 19th Jan 1962
  • 141s 4th Nov 1960 -17th May 1961
  • 56s May 1958 - Apr 1959
  • 51s July 1957 - 30th Aug 1957, washout
  • 22s June 1957 - May 1960
  • 140s Mar 1961 - Jan 1964
  • 21s short wall single-entry June to Sept 1962, failed
  • 6s Mar 1962 shortened down - 4th Jan 1963
  • 33s Oct 1960 - 5th Jan 1963
  • 155s June 1963 - 5th June 1964
  • 55s July 1962 - 3rd Oct 1964
  • 154s Mar 1964 - Oct 1964, slow work, stopped Sep 1965, re-headed face 1971/72, re-opened Apr 1972 - May 1973
  • 48s July 1964 - 1st Apr 1965
  • 69s Nov 1964 - 6th Dec 1966
  • 67s Nov 1964 - 30th June 1966
  • 153s Dec 1964 - 3rd Feb 1966
  • 160s Feb 1966 - 16th Dec 1967
  • 164s Sep 1966 - 21st Feb 1967
  • 65s Dec 1966 - Feb 1968
  • 31s 17th July 1959 - 6th May 1961
  • 32s Feb 1963 - 23rd June 1964
  • 33s Oct 1960 - Jan 1963
  • 35s Sep 1962 - Oct 1964
  • 61s Jan 1963 - July 1964
  • 63s June 1963 - Jan 1965
  • 65s Oct 1966 - Feb 1968
  • 67s and 69s double-unit Oct 1964, split June 1965, 67s finished June 1966, 69s finished Dec 1966
  • 160s Feb 1966 - Mar, shortened down, slow to Dec 1967, short run
  • 164s July 1966 - Feb 1967, short run
  • 253s Feb 1965 - Oct 1965, short run
  • 251s July 1964 - Dec 1964, short run
  • 157s Nov 1961 - Sep 1962, short run
  • 153s Jan 1965 - Feb 1966, short run
  • 250s Apr 1961 - Apr 1963
  • 149s July 1962 - May 1963
  • 145s May 1961 - Nov 1962, short run
  • 254s Nov 1962, long run, finished May 1967
  • 146s May 1968 - Feb 1969, short run
  • 241s Mar 1966, shortened down Oct 1967, re-numbered M41 finished Dec 1969
  • 158s Jan 1967, re-numbered M8 finished Aug 1968
  • 240s Sep 1967, re-numbered M40, finished Feb 1969
  • 242s Dec 1968, re-numbered M30 finished Oct 1969
  • 250s Apr 1961 - Apr 1963
  • 258s Apr 1967, re-numbered M58, finished Nov 1969
  • M62 June 1972 - Nov 1974
  • M61 Oct 1969 - Apr 1972
  • 257s Aug 1968, re-numbered M57, turned to left June 1969, finished Nov 1970
  • M64 Jan 1970 - Oct 1972, long run
  • 48s June 1964, re-numbered M48, long run, finished Oct 1971
  • 142s Jan 1965, re-numbered M42, finished July 1970
  • M31 June 1970 -
  • M21 July 1970 - 2nd Nov 1973
  • M35 Feb 1971 - 25th Oct 1971
  • M33 Oct 1974 - 23rd May 1975
  • M29 - 7th Feb 1975
  • M49 May 1973 - 23rd Jan 1976
  • M47 Apr 1976 - 23rd Dec 1977
  • M44 Sep 1969 - July 1973
  • M21 July 1970 - June 1973, slow to finished Nov 1973
  • M43 Sep 1971 - Apr 1976
  • M49 May 1973 - Jan 1976
  • M47 Apr 1976 - Dec 1977.

The early faces were worked by hand got methods using props and bars and undercut coal blown down by explosives. Some areas of the take had a ‘bell metal’ floor, Shearers and Trepanners and hydraulic walking chocks were introduced but after working a large area the seam was abandoned due to rapid thickening of the middle dirt band and to the South and South West thinning of the seam and to the South East a total washout. Many of the short life panels stopped at faults or were troubled with intrusions in the roof.

Abdy Brinsley:

  • Start drivages from Pit bottom 1969
  • C1 Sep/Oct 1972 -Dec 1976
  • C2 Nov/Dec 1973 - 11th Dec 1976
  • C3 Sep 1976-18th Aug 1979
  • C4 Mar/Apr 1975 - 8th Mar 1978
  • C5 June 1978-2nd Mar 1981
  • C6 Jan 1977 - 16th Feb 1979
  • C7 Aug 1979-7th Dec 1981
  • C8 Mar 1978 - 5th Sep 1980
  • C9 June/July 1983 - May 1986
  • C10 Jan/Feb 1979 - 8th June 1981
  • C12 June 1981-11th Oct 1985
  • C15 Sep 1980 - 20th May 1983
  • C17 Aug 1982 - 25th Oct 1985
  • C19 Dec 1986 - 20th May 1988
  • C20 Jan 1988 - 2nd Aug 1990
  • Panel numbering system changed - AB11 Nov/Dec 1990 - 7th Oct 1991
  • AB25 29th Sep 1990 - 29th May 1992
  • AB27 Mar 1992 - 13th Oct 1993. (18 panels).
    Unfortunately top coal had to be left up to form a good roof and floor dirt cut to make a decent floor in parts total dirt extracted including middle dirt bands was more than coal extracted.

High Hazles:

  • A2 5th May 1984 Feb 1987
  • A9 14th Dec 1981- Feb 1986
  • A3 19th Jan 1981 - 27th June 1983
  • A1 Retreat headings June 1982, face 27th June 1983 - 21st Sep 1984
  • A3 Jan 1981 - June 1983
  • A4 22nd Apr 1985 - 24th June 1988
  • A15 June 1987 Mar 1988
  • Panel numbering system changed - HH11 Nov 1986 Jan 1989
  • HH46 1st June 1991- Sep 1993
  • HH42 10th Apr 1989 -11th May 1991
  • HH40 31st May 1988 - 29th June 1990
  • HH48 - 20th July 1996. (10 conventional longwall advancing and 2 retreat panels).

Top Hard: 3’ 1” coal, 11” dirt, 1’ 5” coal (0.93m coal, 0.27m dirt, 0.42m coal)

  • TH1 retreat Nov 1993 - June 1996
  • TH2 retreat May 1996 - 4th Oct 1997
  • TH3 retreat Jan 1997 - 27th Mar 1998
  • TH4 May 1998 - 26th Apr 1999
  • TH5 Sep 1998 - 16th Apr 1999
  • Development headings stopped 16th Apr 1999. 5 panels. Top Hard accessed by 2 drifts dipping from Abdy / Brinsley at 1in5, start 1991.

2 Development drivages dipping at 1in5 from Top Hard to the Yard/Blackshale in 1996 and a 3rd drift from High Main pit bottom in 1997 were abandoned in July 1997 before reaching the seam.

 

 